NEWS
June 2016
Medskin
Solutions
Dr Suwelack AG, Billerbeck
On the night of 10 June, the delivery of the waste water seal was made. The width of the transport of 7 m required a precise logistics planning. After installation the tank halves are welded on site and the coating is applied.